In This Section
Heating/Cooling equipment shall be sized according to ANSI/ACCA Manual J (current edition), with duct system sized, designed, and installed according to Manual D (current edition). All HVAC equipment will be installed in accordance with the 2024 Edition of the International Mechanical Code & Amendments and 2018 IECC. The exterior HVAC unit will be installed and secured on a concrete pad. HVAC filter with a MERV 8 rating or greater shall be installed. A 12-month supply of filters will be provided by the contractor.