RFP 2022-100 Fire Station 6 and Fire Station Admin Project

Closed December 07, 2022, 02:00 PM

  • Reference number2022-100
  • StatusCanceled/Rejected
  • MeetingsPublic Bid Opening event is at the time of the closing, online via the Zoom link on the right.Awarded information will be posted within 7 days of the bid closing.
  • DisclaimerThe City expressly reserves the right to accept or reject any bid or proposal, and to cancel or modify any request for qualifications.
  • SummaryThe scope of work includes new construction of two buildings; Fire Station 6 and Fire Administration Building at 1000 N 25th Street. Canopy cover of walkway between the two buildings is included as Add Alternate 1.

This alternate includes fabrication and installation of a custom canopy to provide a covered pathway from the Station and employee parking area to the rear entrance of the new Fire Aministration Building. Rooftop photovoltaic system is included as Add Alternate 2. This alternate includes the provision and installation of a custom photovoltaic system on the Fire Station building.