The project generally consists of furnishing all labor, materials, equipment, appurtenances, and incidentals as required to remove existing HVAC equipment and replace it with the new equipment in revised location adapted to the existing structural equipment supports. Provide new controls and revised electrical as required.
The existing domestic water heater will be replaced with a new water heater under this scope. Existing domestic piping to remain and reconnect with new combustion venting installed.
Detailed specifications are attached as Appendices.